We were commissioned by Netze BW to lay new power lines and a microduct system.

Two power lines were laid in a 130 m long trench. These were a low-voltage cable of type NAYY 4×150 and a medium-voltage cable of type NA2XS2Y 3x1x300. After laying, the cables were deposited in a transformer station to be connected by a specialist company. We also laid a PE HD 4×20/15 microduct bundle in the same route for future broadband extensions.

We were also able to lay an empty conduit for telecommunications systems.

The majority of the route included a cycle path, which was resurfaced to its full width (2.10 m) at the request of the municipality.