On behalf of Netze BW, we connected two buildings to the existing gas network.

A new gas pipeline was laid in a 50 m long trench to enable two more houses to be supplied with gas. The clayey subsoil proved to be a particular challenge here. In addition, work had to be carried out directly next to the houses using hand excavation to avoid damaging the brickwork.

The wall breakthroughs into the houses were carried out by a specialist company.

The trench along the entire route was kept to a standard width (0.6 m at the surface).